Sign In | Join Free | My benadorassociates.com |
|
Brand Name : Globa Alloy
Model Number : 4inch Sch40
Certification : API, CE, ISO , PED
Place of Origin : China
MOQ : 1 Tons
Price : 500
Payment Terms : L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability : 1000 Tons
Delivery Time : 5-8 working days
Packaging Details : Standard exported package
Material Number : 1.0031
Grade : E190
Standard : EN 10296-1: 2003 Welded circular steel tubes
Standard 2 : EN 10305-3: 2002 Steel tubes
What's the 1.0031 Steel with E190 Non-Alloy Quality Steel specification, 1.0031 Steel with E190 Non-Alloy Quality Steel chemistry, 1.0031 Steel with E190 Non-Alloy Quality Steel equivalent, 1.0031 Steel with E190 Non-Alloy Quality Steel Mechanical Properties? 1.0031 Steel with E190 Non-Alloy Quality Steel manufacturer in China.
1.0031 Steel with E190 Non-Alloy Quality Steel
Grade : | E190 | |||
Number: | 1.0031 | |||
Classification: | Non-alloy quality steel | |||
Standard: |
|
1.0031 Steel with E190 Non-Alloy Quality Steel
C | Si | Mn | P | S |
max 0.1 | max 0.35 | max 0.7 | max 0.045 | max 0.045 |
Rm - Tensile strength (MPa) (+CR) | 270 |
ReH - Minimum yield strength (MPa) (+CR) | 190 |
A - Min. elongation at fracture (%) longitud., (+CR) | 26 |
A - Min. elongation at fracture (%) transverse, (+CR) | 24 |
1.0031 Steel with E190 Non-Alloy Quality Steel
MIDDLE EAST Country | Deliver Days | Port Name |
Malaysia E190 Non-Alloy Quality Steel | 10 - 20 Days | Port of Klang, Malaysia - Penang Port, Malaysia |
Singapore E190 Non-Alloy Quality Steel | 10 - 20 Days | Northport , Malaysia - Westports, Malaysia |
Thailand E190 Non-Alloy Quality Steel | 20-30 Days | Port of Laem Chabang, Thailand |
Philippines E190 Non-Alloy Quality Steel | 20-30 Days | Port of Manila - Port of Jordan, Philippines |
Indonesia E190 Non-Alloy Quality Steel | 25-40 Days | Jakarta Tanjung Priok Seaport indonesia |
Sri Lanka E190 Non-Alloy Quality Steel | 10-15 Days | Port of Colombo |
Bangladesh 1.0031 Steel | 5-10 Days | The Port of Chittagong (Bangladesh) |
UAE 1.0031 Steel | 5-10 Days | Port of Mina Jebel Ali (Jebel Ali - Dubai ) , United Arab Emirates & Port Zayed (Mina Zayed), United Arab Emirates |
Saudi Arabia 1.0031 Steel | 10-20 Days | Jeddah Islamic Port, Saudi Arabia |
Turkey 1.0031 Steel | 20-30 Days | Haydarpasa, Izmir and Mersin Port - Port of Ambarli, Turkey |
Qatar 1.0031 Steel | 8 - 12 Days | Port of Doha, Qatar & Port of Al Wakrah, Qatar |
Oman 1.0031 Steel | 5 - 10 Days | Port Of Sohar - Oman , Port of Muscat - Oman |
Kuwait 1.0031 Steel | 8 - 15 Days | Port of Kuwait, Kuwait |
Yemen 1.0031 Steel | 8 - 15 Days | Port of Aden, Yemen |
Jordan 1.0031 Steel | 15 - 20 Days | Port of Aqaba, Jordan |
Cyprus 1.0031 Steel | 16 - 20 Days | Famagusta Port, Cyprus |
AFRICAN Countries Port | Deliver Days | Port Name |
Nigeria 1.0031 Steel | 35 - 40 days | Tin Can Island Port Complex, Nigeria |
Algeria boiler Steel Tubes | 35 - 40 days | Port of Alger, Algeria - Port of Bejaia, Algeria - Port of oran, Algeria - Port of ghazaouet, Algeria |
Angola | 35 - 40 days | Port of Luanda, Angola |
South Africa | 20 - 30 days | Port Elizabeth, South Africa |
Libya | 18 - 20 | Port of Benghazi, Libya |
Egypt | 15 - 20 Days | Port of Damietta, Egypt |
Sudan | 10-15 Days | Port of Sudan, Sudan |
Equatorial Guinea | 35 - 40 days | Port of Malabo, Equatorial Guinea - Port of Bata, Equatorial Guinea |
The Republic Of Congo | 35 - 40 days | Port of Matadi, Congo - Kinshasa |
Gabon | 35 - 40 days | Port of Owendo, Gabon |
Welded Circular Coated Steel Pipe 1.0031 Non Alloy EN 10296-1 2003 E190 Grade Images |